|
Before the work began |
|
Saint-Henri street view with the old industrial fire escape which wasn't to code |
|
Removal of fire escape |
|
Removal of fire escape |
|
Washing over 100 years of dirt and soot off the brick |
|
Keep on washing... |
|
Grinding the old mortar |
|

LA PRESSE |
Replacing bricks. The "Parapais" where there are often problems. Over 1000 bricks were replaced on both buildings ! |
|
|
Creating two 10 foot garage openings.
A steel structure was used to support the building while work continued. |
|
The structure made it through the winter December 2006 |
|
Brick arches were created to match the new windows above. |
|
The new garage doors. Above the garage is stone. |
 |
Exterior work completed
less basement windows and new front doors (expected mid July 2008).
|

To see it is to believe it! |
 |